Concrete Calculator

Work out how much concrete a slab, footing, round column or set of steps needs, in cubic yards or cubic metres, with the ready-mix order and the number of bags.

Calculator Construction Updated Oct 3, 2026
How to Use
  1. Choose what you are pouring: a slab, a footing, round columns (piers, post holes, Sonotubes) or steps.
  2. Pick Feet & inches or Metric, then enter the sizes. Slab thickness and footing sizes are in inches (or cm).
  3. Leave the extra at 10% unless you know your forms and ground well; it covers an uneven base, spillage and form bulge.
  4. Read the volume to order and the bag counts. Add a ready-mix price per yard to see the cost.
  5. Check Show Work for every step, from the raw volume to the rounded order.
Input
ft
ft
in
in
in
in
ft
in
in
ft
ft
%
/yd³
Presets
The pour
Order
—
80 lb bags
—
60 lb bags
—
Weight
—

Worked Example

A 20 × 12 ft patio, 4 inches thick. Turn the thickness into feet first: 4 in = 0.333 ft. Volume = 20 × 12 × 0.333 = 80 ft³, and 80 ÷ 27 = 2.96 yd³. With 10% extra that is 88 ft³ (3.26 yd³), so the truck order rounds up to 3.5 yd³. In bags: 88 ÷ 0.60 = 146.7, so 147 bags of 80 lb. The finished slab weighs about 80 × 150 = 12,000 lb, or 6 tons.

Eight deck piers, 12 in across and 4 ft deep. Each is π × 0.5² × 4 = 3.14 ft³, so eight hold 25.1 ft³. With 10% extra, 27.6 ft³ ÷ 0.60 = 46.1, so 47 bags of 80 lb.

The common mistake: leaving the thickness in inches. 20 × 12 × 4 = 960 ft³, which is 35.6 yd³: twelve times too much concrete, because 4 inches is a third of a foot, not 4 feet.

Show Work

Enter the sizes to see the step-by-step working.

Formulas

Slab or footing
V = L × W × T
All in feet (or metres): divide inches by 12
Round column
V = π × (d ÷ 2)² × h × n
n columns of diameter d and height h
Steps
V = W × R × (U × (n − 1)n ÷ 2 + n × P)
n risers of R, treads U, landing P, width W
Cubic yards
yd³ = ft³ ÷ 27
1 yd³ = 0.765 m³
Bags
80 lb ≈ 0.60 ft³ · 60 lb ≈ 0.45 ft³
25 kg ≈ 0.0117 m³ · 20 kg ≈ 0.0094 m³
Weight
≈ 150 lb/ft³
About 2,400 kg/m³; 4,050 lb per yard

Ordering Concrete

Concrete is cement, water, sand and stone that hardens by a chemical reaction, not by drying, so it keeps gaining strength for weeks and must be kept damp while it cures. The Romans built the Pantheon’s dome from it nearly 1,900 years ago; modern Portland cement was patented by Joseph Aspdin in 1824.

In the US, ready-mix is sold by the cubic yard and usually ordered in quarter-yard steps; a standard truck carries about 10 yd³ (8 m³), and many suppliers add a short-load fee below about 4 to 5 yards. Bagged premix suits small jobs: mixing 45 bags by hand for a single yard is a hard day’s work, and a slab poured in batches risks joints where the batches meet.

About This Calculator

This calculator finds the concrete for slabs, footings, round columns and steps, adds an allowance for waste, rounds a ready-mix order up to the next quarter yard (or quarter cubic metre), counts 80 and 60 lb bags (25 and 20 kg in metric), and estimates the weight and cost. The drawing shows the shape with your sizes.

Everything runs in your browser; nothing you enter is sent anywhere. Bag yields are typical for premix; check the bag you buy, and follow local codes for structural work.

Related calculators: Concrete Block Calculator, Rebar Calculator, and Gravel Calculator.

Frequently Asked Questions

How many bags of concrete make a cubic yard?

A cubic yard is 27 cubic feet. An 80 lb bag of premix makes about 0.60 ft³, so a yard takes 45 bags; a 60 lb bag makes about 0.45 ft³, so 60 bags. Past about one cubic yard, a ready-mix truck is usually cheaper and much less work.

How thick should a concrete slab be?

Four inches (10 cm) suits patios, paths and shed bases. Driveways and garage floors are usually 5 to 6 inches (12–15 cm), on a compacted gravel base. Check local codes for structural slabs and footings.

How much extra concrete should I order?

Order 5–10% more than the calculated volume. The ground under a slab is never perfectly flat, forms bow, and some is always left in the truck or wheelbarrow. Running short in the middle of a pour leaves a weak cold joint, which costs far more than a little extra.

How much concrete do I need for a post hole?

Use the Columns mode with the hole diameter and depth. A 10-inch hole 3 ft deep holds 1.64 ft³, about three 80 lb bags; the post takes up some of that, so the count is a safe upper figure. A 4×4 post removes about 0.33 ft³ over 3 ft.

How much does a cubic yard of concrete weigh?

Normal concrete weighs about 150 lb per cubic foot, so a cubic yard is about 4,050 lb, just over 2 US tons (about 2,400 kg per cubic metre). That matters for trailers and pickups: a single yard is more than most light trucks should carry.

How do I use the Concrete Calculator?

Simply type your numbers and read the result, which refreshes the instant you change something. There is nothing to submit and nothing to wait for.

Do I need to install or sign up for anything?

Not at all — it runs in the browser with nothing to install and no account. After it loads once, it even works without an internet connection.

Is my information private?

Yes. Everything happens in your browser. Nothing you type is sent to a server or saved anywhere.

Common Use Cases

Patio or shed base

A 10×10 ft pad 4 in thick is 1.23 yd³; with 10% extra that is 1.36 yd³, or 62 bags of 80 lb, which is about where where a small truck load starts to make sense.

Driveway slab

A 24×20 ft driveway 5 in thick needs 7.41 yd³ before waste, so order 8.25 yd³: one truck.

Deck footings

Eight 12 in Sonotubes 4 ft deep hold 25.1 ft³; with 10% extra, 47 bags of 80 lb.

Wall footing

A 40 ft footing 20 in wide and 10 in deep is 55.6 ft³, about 2.06 yd³ before waste.

Front steps

Three 7 in steps with 11 in treads, 4 ft wide, with a 3 ft landing come to 27.4 ft³, about 1.02 yd³ before waste.

Last updated: